TOIP Final Report

The TOIP report was completed in May 2008 providing ITS deployment recommendations for the Wisconsin corridors.

Document Type Size Date
Traffic Operations Infrastructure Plan - Brochure PDF 1.11 MB 06/02/2008
Traffic Operations Infrastructure Plan - Executive Summary PDF 8.33 MB 06/16/2008
Traffic Operations Infrastructure Plan - Final Report PDF 11.06 MB 06/16/2008
Appendix A: Traffic Management & Surveillance PDF 10.54 MB 06/16/2008
Appendix B: Traveler Information PDF 15.53 MB 06/16/2008
Appendix C: Signal Systems PDF 27.66 MB 06/16/2008
Appendix D: Data Processing PDF 592 KB 06/16/2008
Appendix E: Technology Scan PDF 23.35 MB 06/16/2008


Corridor and Metro Node Maps (2008)