TOIP Final Report

The TOIP report was completed in May 2008 providing ITS deployment recommendations for the Wisconsin corridors.

Document Type Size Date
  Executive Summary PDF 8.33 MB 06/16/2008
  Traffic Operations Infrastructure Plan PDF 11.06 MB 06/16/2008
  Appendix A: Traffic Management & Surveillance PDF 10.54 MB 06/16/2008
  Appendix B: Traveler Information PDF 15.53 MB 06/16/2008
  Appendix C: Signal Systems PDF 27.66 MB 06/16/2008
  Appendix D: Data Processing PDF 592 KB 06/16/2008
  Appendix E: Technology Scan PDF 23.35 MB 06/16/2008

Corridor and Metro Node Maps (2008)